Friday, July 31, 2009

Rain is the name of the game


I just had to post this cute pic of Nola taken while we were blueberry picking last week.

I gathered up some fans and our dehumidifier and took them to the house so we could try to dry up the drywall compound. It's been so wet and humid the drywall job is taking longer than normal. We're also drowning in mud. We've been waiting for the excavation contractor to come back and finish the grading. Right now we have about 10 huge piles of dirt (imported fill; yes, we needed more!!) waiting to be spread out. I'd love to post some pictures, but it hasn't stopped raining long enough for me to poke my head out the window and take some pictures (sorry, Mom, we'll try tomorrow.)
The past several weeks we have been consumed with 1) trying to catch any errors before they were covered with drywall, and 2) trying to get everything lined up so we can swarm into the house after the drywall is done. We decided to splurge and hire a painter. We got an incredible price to have the whole house painted and the exposed beams oiled. Our frustrations have mostly involved the installation of the ventilation system in regards to quality and timeliness. We've ended up doing portions of the work ourselves to keep things on schedule. I've been working on ordering/buying everything we need to do the first bathroom (downstairs) and the kitchen. I made a pilgrimage to IKEA and ordered our kitchen cabinets. After looking for used cabinetry in reclaimed stores and online for the past 9 months, we finally gave up trying to find something that was going to fit in our space/fit our needs. We also looked at some "sustainable" wood products, but cost and additional labor for finishing the wood made that option cost prohibitive. So we had to make a sacrifice on the "green cabinetry" and go for the IKEA option. They now have a solid wood, oak door that we like that should wear well. I was impressed with the kitchen department at IKEA. They were very helpful (don't ever go on a weekend, though) and put my order together promptly and correctly (so far). I ended up getting my oven and microwave from IKEA - they are Whirlpool products that cost a bit less than the equivalent models at Sears and have a more stylish look. I also was concerned about getting appliances to fit in the IKEA oven wall cabinets. One more recommendation on IKEA. Go to the store prepared with a full list of cabinets and accessories, or upload your custom design to their website using the IKEA Kitchen Planner software. I made the mistake and took a CD, but they won't accept outside data media. My other success this week was finding a reasonably priced slate from Vermont, without driving to Vermont to buy it. Suprisingly, I found some nice green grey Vermont slate through Home Depot at a very competitive price. Most slate, usually multicolored, you see is from Brazil. That's a long trip for some chipped rocks.
Tomorrow, Jer will be picking up our strand bamboo flooring. Today I installed the shower pan liner and sandmix mortor base for the tile in the downstairs shower stall. It was cheaper than a base, but more work and will look much better than a solid base. That's the theme for this house. Why skimp out on the details now...

Rain is the name of the game


I just had to post this cute pic of Nola taken while we were blueberry picking last week.

I gathered up some fans and our dehumidifier and took them to the house so we could try to dry up the drywall compound. It's been so wet and humid the drywall job is taking longer than normal. We're also drowning in mud. We've been waiting for the excavation contractor to come back and finish the grading. Right now we have about 10 huge piles of dirt (imported fill; yes, we needed more!!) waiting to be spread out. I'd love to post some pictures, but it hasn't stopped raining long enough for me to poke my head out the window and take some pictures (sorry, Mom, we'll try tomorrow.)
The past several weeks we have been consumed with 1) trying to catch any errors before they were covered with drywall, and 2) trying to get everything lined up so we can swarm into the house after the drywall is done. We decided to splurge and hire a painter. We got an incredible price to have the whole house painted and the exposed beams oiled. Our frustrations have mostly involved the installation of the ventilation system in regards to quality and timeliness. We've ended up doing portions of the work ourselves to keep things on schedule. I've been working on ordering/buying everything we need to do the first bathroom (downstairs) and the kitchen. I made a pilgrimage to IKEA and ordered our kitchen cabinets. After looking for used cabinetry in reclaimed stores and online for the past 9 months, we finally gave up trying to find something that was going to fit in our space/fit our needs. We also looked at some "sustainable" wood products, but cost and additional labor for finishing the wood made that option cost prohibitive. So we had to make a sacrifice on the "green cabinetry" and go for the IKEA option. They now have a solid wood, oak door that we like that should wear well. I was impressed with the kitchen department at IKEA. They were very helpful (don't ever go on a weekend, though) and put my order together promptly and correctly (so far). I ended up getting my oven and microwave from IKEA - they are Whirlpool products that cost a bit less than the equivalent models at Sears and have a more stylish look. I also was concerned about getting appliances to fit in the IKEA oven wall cabinets. One more recommendation on IKEA. Go to the store prepared with a full list of cabinets and accessories, or upload your custom design to their website using the IKEA Kitchen Planner software. I made the mistake and took a CD, but they won't accept outside data media. My other success this week was finding a reasonably priced slate from Vermont, without driving to Vermont to buy it. Suprisingly, I found some nice green grey Vermont slate through Home Depot at a very competitive price. Most slate, usually multicolored, you see is from Brazil. That's a long trip for some chipped rocks.
Tomorrow, Jer will be picking up our strand bamboo flooring. Today I installed the shower pan liner and sandmix mortor base for the tile in the downstairs shower stall. It was cheaper than a base, but more work and will look much better than a solid base. That's the theme for this house. Why skimp out on the details now...

Thursday, July 30, 2009

Sweating the Details

In the feverish pace of putting the many pieces in place that constitute this project, we realize we simply aren't going to catch everything. Coordinating all the various tasks while solving the problems as they pop up leaves little room for ruminating on the process and there will be things we wished we did or caught or changed or.....

Even though we are getting towards the tail end of the project, it seems the amount of decisions to be made have increased. It's all the finishing details; stair components, concrete stain, lights, cabinets, tile, backsplash, yada, yada, you get the idea. My mind is in texture overload. And there is Karann on the computer researching pendant lights. She's unstoppable. 

I'm working on the stairs tomorrow. Scored some old barn wood, 2" x 12" of various lengths that I'm going to have milled at a local lumberyard. More recycling and monetary savings. I love that combo. 

We're going to be constructing the components for the stairs at the shop next week and getting everything set so when the painters are done and we stain the concrete everything is set to go. Karann's focus has been the bathrooms and kitchen (surprise!) and she's been getting all the ducks in a row to outfit these rooms in short order.

I've arranged for the painter to get going on Monday but we may have an issue with the taping/mudding contractor running late due to the humidity slowing the drying time. It's been an extremely wet July which hasn't helped. Fortunately, the only thing that has been against us is the weather, oh, and the contractors who don't show up when they're supposed to. But we're managing.  We've got a lot of other things to be thinking about.

Sweating the Details

In the feverish pace of putting the many pieces in place that constitute this project, we realize we simply aren't going to catch everything. Coordinating all the various tasks while solving the problems as they pop up leaves little room for ruminating on the process and there will be things we wished we did or caught or changed or.....

Even though we are getting towards the tail end of the project, it seems the amount of decisions to be made have increased. It's all the finishing details; stair components, concrete stain, lights, cabinets, tile, backsplash, yada, yada, you get the idea. My mind is in texture overload. And there is Karann on the computer researching pendant lights. She's unstoppable. 

I'm working on the stairs tomorrow. Scored some old barn wood, 2" x 12" of various lengths that I'm going to have milled at a local lumberyard. More recycling and monetary savings. I love that combo. 

We're going to be constructing the components for the stairs at the shop next week and getting everything set so when the painters are done and we stain the concrete everything is set to go. Karann's focus has been the bathrooms and kitchen (surprise!) and she's been getting all the ducks in a row to outfit these rooms in short order.

I've arranged for the painter to get going on Monday but we may have an issue with the taping/mudding contractor running late due to the humidity slowing the drying time. It's been an extremely wet July which hasn't helped. Fortunately, the only thing that has been against us is the weather, oh, and the contractors who don't show up when they're supposed to. But we're managing.  We've got a lot of other things to be thinking about.

Tuesday, July 21, 2009

Who Destroyed the First Parish Meeting House of Sterling?


From the Brooklyn Eagle, March 23, 1842:






From the Brooklyn Eagle, March 25, 1842:




Was this mystery ever solved?

Who Destroyed the First Parish Meeting House of Sterling?


From the Brooklyn Eagle, March 23, 1842:






From the Brooklyn Eagle, March 25, 1842:




Was this mystery ever solved?

Tuesday, July 14, 2009

More finishes, well, sort of.

Its been a strange summer so far. The new truck has had troubles a plenty--boo, hiss, but the hubby keeps keeping on. He's passed the frustration on to me--which is my job, to keep him as cool headed as possible--and I pass the frustration on to my stitching. I wonder how many of us do that? Deal with all the negatives in our lives by stitching? Sure does keep me a lot calmer. How about you all?


First up, GOODWILL by LHN. I stitched this one because of the lovely colors and because it was a thread pack. I didn't have to hunt down any of the threads, just a lovely piece of linen to stitch it on. And I didn't even have to make a frame up--I have two large tubs of frames I've bought over the years and I had a perfect size to use. (I actually had 4 the perfect size but wrong colors.) There was a lot of mindless stitching, stitching without having to count very often, and that made it absolutely perfect for my purposes. I was sad when I got it finished, but today, very happy that I could stick it in a frame and hang it on the wall. I'm thinking, for the time being, that the wall is finished. (I did think of doing LHN's The Rose in Morning and doing it over one, for a tiny horizontal piece.) Does it seem that I was in a hurry to get that wall done? Absolutely, hubby should be home in the next day or two.



The next piece isn't really finished. The stitching is done but not the finishing work--and I'm a bit nervous about doing this finish. It's Witch's Hat Scissor Case by Historic Stitches. It was really easy to stitch, but would have been much easier to stitch on a different color linen. Done on Black Belfast, I couldn't believe how much difficulty I had in seeing the threads. I think it took me twice as long as it would have on a lighter color. My picture turned the fabric gray but it really is black. The chart called for two pieces of Black Belfast, 11 x 11 inches--I stitched it on one piece of Belfast, 11 x 11 and still have two large squares left over to do a scissor fob or biscornu. But, I've hesitated starting the finish process as I don't think I have enough skill to do it justice. I'm going to try anyway and I'll let you all tell me what you think of it.

I spent most of the past weekend watching Harry Potter movies and stitching on Shepherd's Bush "Into the Night". Didn't really have enough done to take a picture of it. Hopefully, after getting the top part done, the specialty rows will go quickly enough so it actually looks like I stitched something. Of course, eldest son has already said it's going to be his one day--and I think I'll surprise him and give it to him when he buys his first house. (He's looking.)

It's hard to believe that summer is half over already, and the grandkids go back to school next month. What's up with that? Am I the only one who remembers going back to school right after Labor day, in September? I shudder to think of all those young people sweltering in classrooms during the hottest part of the summer.


And with all the heat, the problems with finances, truck troubles and all, we have a new member of the family. Banshee is some kind of terrier, very small, short, with these tiny short legs. We are having a terrible time getting her housebroken but she's finally getting the idea. She is Chad's puppy and he's doing most of the work with her. She really is adorable, and I'll have a picture of her next post. But, do you see a theme here with pet names? We have Boo, Spooky, Shadow and Banshee--two black pets and two gray ones. Shadow has finally taken to the new puppy but Spooky is still hissing and spitting at her. Boo has become her protector, though she's not too fond of Banshee using her tail as a toy. As you can see from the photo above, Spooky seems to spend all her time sleeping on our bed--its a high four poster and the puppy can't reach her there.

I've had a lot of fun reading everyone's posts, and I am amazed at those who can post nearly every day and show pictures too. How on earth do you do that? Debbie, if that was your first framing job, how talented you are. You did a super great job. And Terri Boog, that sampler is to die for. Coni, I love your newest LJP finish--its super spectacular! It would make a really lovely pillow with some patriotic fabrics--or a great wall decoration. Nicole, as always, I'm amazed at how much lovely stitching you do, and with three small boys to raise. Cathy, I love seeing pictures of those grandchildren just as much as seeing your stitching. Deb, busy as always but when do we get to see the pics that are hidden behind those smiley faces? Kath, been missing you and don't think my emails are getting through to you. And to anyone who has been waiting for an email from me--I probably already sent it, but our ISP has been having problems the last few weeks, and most of what I send out is not getting where it should go. Anyway, I love reading all your blogs, it's nearly like visiting in your home and stitching with you, without the drive.

Stitch on, dear friends. Can't wait to see what you stitch on next. Enjoy your summer, and Terri, watch out--that was a lovely looking and very appetizing table you set on the deck. Made me ready to jump in the car and come for a visit. For those that don't know, Terri lives in my old 'neck of the woods' and there are times that I sure do miss Michigan. Until next time. . . . . . . .